×

Method for controlling fluid production from a wellbore by using a script

  • US 9,482,077 B2
  • Filed: 09/22/2009
  • Issued: 11/01/2016
  • Est. Priority Date: 09/22/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method for controlling formation fluid flow into a production wellbore containing a plurality of production devices, comprising:

  • defining a first setting of each production device in the plurality of production devices, wherein the first setting of a selected production device determines a first flow rate of formation fluid flowing from a formation into a production tubular in the wellbore, the formation fluid comprising at least one of oil and gas;

    displaying, at a user interface, a first chart showing a status indicator representing the plurality of production devices over a length of the production wellbore and indicating their status, the first chart further showing measurements of a parameter related to the first flow rate of formation fluid obtained at the plurality of production devices at a selected time;

    displaying, at the user interface, a second chart showing the measurements of the parameter over time at a selected position;

    graphically manipulating the measurements of the parameter in the first chart to indicate a desired flow rate at a selected depth;

    using a model to determine a second setting for at least one of the plurality of production devices based on the desired flow rate at the selected depth;

    generating a script corresponding to the second setting;

    submitting the script to an operator for approval; and

    implementing the script without modification upon approval of the operator.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×