Box-on-box self-stacking substructure for a drill rig
First Claim
Patent Images
1. A drill rig comprising:
- a first master skid and a second master skid, each master skid comprising a base box structure and at least one supported box structure, in a pre-assembly configuration said base box structure and said supported box structure are arranged in a nested relationship;
said first and second master skids positioned a distance apart and secured to one another;
at least one hydraulic ram carried by each base box structure, said hydraulic ram positioned to engage said supported box structure, said hydraulic ram configured to lift said supported box structure from said nested position to an operational position;
at least one support pin carried by each master skid, said support pin moveable from a first position to a second position; and
,at least one support point carried by each master skid, whereby each support pin is configured to engage said support point when said support pin is in the second position, engagement of said support point by said support pin retains said supported box structures in the operational position after said supported box structures has been lifted to the operational position.
1 Assignment
0 Petitions
Accused Products
Abstract
Disclosed is a drill rig having two master skids. Wherein prior to assembly of the drill rig, the master skids include a base box structure and a supported box structure arranged in a nested relationship. Additionally, the base box structures house hydraulic components and support components necessary to raise and support the supported box structure at an operational position. Further, the base box structures includes hydraulic components necessary to raise the drill rig mast to an operational position.
-
Citations
44 Claims
-
1. A drill rig comprising:
-
a first master skid and a second master skid, each master skid comprising a base box structure and at least one supported box structure, in a pre-assembly configuration said base box structure and said supported box structure are arranged in a nested relationship; said first and second master skids positioned a distance apart and secured to one another; at least one hydraulic ram carried by each base box structure, said hydraulic ram positioned to engage said supported box structure, said hydraulic ram configured to lift said supported box structure from said nested position to an operational position; at least one support pin carried by each master skid, said support pin moveable from a first position to a second position; and
,at least one support point carried by each master skid, whereby each support pin is configured to engage said support point when said support pin is in the second position, engagement of said support point by said support pin retains said supported box structures in the operational position after said supported box structures has been lifted to the operational position. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14)
-
-
15. A drill rig comprising:
-
a first master skid and a second master skid, each master skid comprising a base box structure and at least one supported box structure, in a pre-assembly configuration said supported box structure is arranged in a nested relationship over said base box structure; said first and second master skids positioned a distance apart and secured to one another; at least two hydraulic rams carried by each base box structure, each hydraulic ram positioned to engage a contact point carried by said supported box structure, said hydraulic rams configured to lift said supported box structure from said nested position to an operational position; at least one support pin carried by each master skid, said support pin moveable from a first position to a second position; and
,at least one support point carried by each master skid, whereby each support pin is configured to engage said support point when said support pin is in the second position, engagement of said support point by said support pin retains said supported box structures in the operational position after said supported box structures has been lifted to the operational position. - View Dependent Claims (16, 17, 18, 19, 20, 21, 22, 23)
-
-
24. A drill rig comprising:
-
a first master skid and a second master skid, each master skid comprising a base box structure and at least one supported box structure, in a pre-assembly configuration said base box structure and said supported box structure are arranged in a nested relationship; said first and second master skids positioned a distance apart and secured to one another; at least one hydraulic ram carried by each base box structure, said hydraulic ram positioned to engage said supported box structure, said hydraulic ram configured to lift said supported box structure from said nested position to an operational position; at least one support pin carried by each master skid, said support pin moveable from a first position to a second position; at least one support point carried by each master skid, whereby each support pin is configured to engage said support point when said support pin is in the second position, engagement of said support point by said support pin retains said supported box structures in the operational position after said supported box structures has been lifted to the operational position; a starter section of a mast wherein at least a portion of said starter section of a mast is nested within each base box structure; and mast hydraulics initially carried within said base box structure, said mast hydraulics suitable for raising a mast supported by said drill rig to an operational position. - View Dependent Claims (25, 26, 27, 28, 29, 30, 31, 32, 33, 34)
-
-
35. A drill rig comprising:
-
a first master skid and a second master skid, each master skid comprising a base box structure and at least one supported box structure in a pre-assembly configuration said supported box structure is configured to nest over said base box structure prior to assembly of said drill rig; said first and second master skids positioned a distance apart and secured to one another by bracing; said supported box structures secured to one another by bracing; a rig floor supported by said top box structures; at least one hydraulic ram carried by each base box structure, said ram positioned to engage said supported box structure, said ram configured to lift said supported box structure from a first nested position over said base box structure to an operational position; at least two support pins carried by each master skid, said support pins moveable from a first position to a second position; and
,at least two support points carried by each master skids, whereby each support pin is configured to engage said support point when said support pin is in the second position, engagement of said support point by said support pin retains said supported box structures in the operational position after said supported box structures has been lifted from the nested position to the operational position. - View Dependent Claims (36, 37, 38, 39, 40, 41, 42)
-
-
43. A method of raising a drill rig to an operational height comprising:
-
positioning first and second master skids a distance apart, said master skids comprising; a base box structure and at least one supported box structure, arranged in a nested relationship; at least one hydraulic ram carried by each base box structure, said hydraulic ram positioned to engage said supported box structure, said hydraulic ram configured to lift said supported box structure from said nested position to an operational position; at least one support pin carried by each master skid, said support pin moveable from a first position to a second position; and
,at least one support point carried by each master skid, whereby each support pin is configured to engage said support point when said support pin is in the second position; securing said master skids to one another with bracing; actuating said hydraulic rams carried by each base box structure thereby lifting said supported box structure; moving each support pin carried by each master skid from said first position to said second position; adjusting the position of said supported box structure such that each support pin engages a support point thereby retaining said supported box structure at said operational height. - View Dependent Claims (44)
-
Specification