System and method for processing waste material
First Claim
Patent Images
1. A material handling system, comprising:
- a plurality of waste holders operable to store waste material;
a plurality of mobile drive units operable to transport waste material stored by the waste holders; and
a management module operable to;
determine a rate at which waste accumulates in a waste holder, wherein the waste holder is located at a first location adjacent to a workstation;
determine, based upon the rate, a first time associated with the waste holder, the first time representing an estimated time at which a waste accumulation in the waste holder is expected to reach a threshold;
instruct, at the first time, a selected one of the plurality of mobile drive units to move to the waste holder at the first location;
receive a collection request from a user associated with the waste holder;
determine historical information associated with the user; and
adjust the first time based at least upon the historical information.
3 Assignments
0 Petitions
Accused Products
Abstract
A method for processing waste in a material handling system includes detecting an occurrence of a trigger event associated with a waste holder located at a first location and, in response to detecting the trigger event, moving a mobile drive unit to the first location. The method also includes loading waste material onto the mobile drive unit at the first location and transporting the waste material to a waste station using the mobile drive unit.
-
Citations
19 Claims
-
1. A material handling system, comprising:
-
a plurality of waste holders operable to store waste material; a plurality of mobile drive units operable to transport waste material stored by the waste holders; and a management module operable to; determine a rate at which waste accumulates in a waste holder, wherein the waste holder is located at a first location adjacent to a workstation; determine, based upon the rate, a first time associated with the waste holder, the first time representing an estimated time at which a waste accumulation in the waste holder is expected to reach a threshold; instruct, at the first time, a selected one of the plurality of mobile drive units to move to the waste holder at the first location; receive a collection request from a user associated with the waste holder; determine historical information associated with the user; and adjust the first time based at least upon the historical information. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A material handling system, comprising:
-
a plurality of waste holders operable to store waste material; a plurality of mobile drive units operable to transport waste material stored by the waste holders; and a management module operable to; instruct a selected one of the plurality of mobile drive units to perform a first task; detect an occurrence of a trigger event associated with a waste holder located at a first location adjacent to a workstation; determine that a second task associated with the trigger event has a higher priority than the first task; assign the second task to the mobile drive unit, wherein the mobile drive unit discontinues the first task to perform the second task; receive a collection request from a user associated with the waste holder; determine historical information associated with the user; and adjust the first time based at least upon the historical information. - View Dependent Claims (8, 9, 10, 11, 12, 13)
-
-
14. A method for material handling, comprising:
-
detecting a first trigger event associated with a first waste holder, wherein the first waste holder is located at a first location adjacent to a first workstation; after detecting the first trigger event, detecting a second trigger event associated with a second waste holder, wherein the second waste holder is located at a second location adjacent to a second workstation; selecting a mobile drive unit from a plurality of mobile drive units; instructing the selected mobile drive unit to move to one of the first location or the second location based on relative priority between the first and second trigger events; instructing the selected mobile drive unit to load waste material onto the mobile drive unit at the one of the first location or the second location; and instructing the selected mobile drive unit to transport waste material from the one of the first location or the second location to a waste station, wherein the waste station is operable to perform a waste processing task. - View Dependent Claims (15, 16, 17, 18, 19)
-
Specification