×

Grid optimization resource dispatch scheduling

  • US 9,523,967 B2
  • Filed: 03/14/2014
  • Issued: 12/20/2016
  • Est. Priority Date: 04/30/2012
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for implementation by one or more data processors, the method comprising:

  • receiving, by the one or more data processors, data indicating discrepancies between expected and actual change in electrical load of a resource, the expected change in electrical load based on a previously transmitted first resource scheduling instruction including expected change in electrical load;

    calculating, using the received data and the one or more data processors, a lost capacity envelope based on a load on the resource, a duration defined by a deployment rule, and an indication of how often the resource can accept an instruction, the lost capacity envelope being an estimate of future discrepancies between expected and actual change in electrical load and varying over time;

    processing, when the discrepancies between expected and actual resource performance exceeds a predetermined magnitude, a second resource scheduling instruction specifying a desired change in electrical load according to the lost capacity envelope, the second resource scheduling instruction comprising the lost capacity envelope; and

    providing, using the one or more data processors, data characterizing the second resource scheduling instruction to a resource agent and controlling a switched load based on said data characterizing the second resource scheduling instruction.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×