×

BIM-aware location based application

  • US 9,525,976 B2
  • Filed: 05/10/2012
  • Issued: 12/20/2016
  • Est. Priority Date: 05/10/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method for implementing a building information model (BIM)-aware location based application on a mobile device, comprising:

  • displaying a floor plan of a building on the mobile device based on a first determined location of the mobile device;

    implementing a number of BIM equipment representations throughout the floor plan of the building on the mobile device based on stored BIM data, wherein the number of BIM equipment representations are selectably visible based on the first determined location of the mobile device and based on a predetermined portion of the floor plan display that is made visible by selection from a set of functions that includes zoom-in, zoom-out, and rotate;

    receiving updated BIM data that includes real-time status information from system equipment within the building, wherein the real-time status information is collected via a number of sensors;

    providing real-time status information for the number of BIM equipment representations on the mobile device, wherein the number of BIM equipment representations are based on the first determined location of the mobile device and wherein the real-time status information is displayed at a position on the location of the BIM equipment representations displayed on the floor plan of the building;

    receiving an alert on the mobile device that physical equipment corresponding to the number of BIM equipment representations outside a predetermined operating threshold based on the real-time status information;

    displaying video confirmation of the alert on the mobile device of the physical equipment corresponding to the number of BIM equipment representations outside the predetermined operating threshold;

    providing a number of directions from the first location of the mobile device to a location of an access point for the physical equipment corresponding to the number of BIM equipment representations outside the predetermined operating threshold, wherein the location of the access point for the physical equipment and location of the physical equipment are different locations within the building; and

    updating the floor plan with the implemented number of BIM equipment representations and real-time status information based on a second determined location of the mobile device.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×