Hybrid air conditioning control process
First Claim
Patent Images
1. A process for conditioning air in a building comprising the steps of:
- selecting an air conditioning system in the building having a first air conditioning unit of predetermined capacity and a second air conditioning unit having an equal or smaller capacity than the first air conditioning unit and having a dehumidifier and having a process controller wirelessly connected to each said first and second air conditioner units and to said dehumidifier and having a control panel having energy saving or comfort operating priority inputs and being operatively coupled to said process controller, said air conditioning system also having a temperature sensor for sensing temperature within said building and a humidity sensor for sensing humidity within the building both sensors being operatively connected to said process controller;
selectively inputting energy saving and comfort operating priorities into said control panel and into said control processor;
sensing the temperature and humidity in said building with said temperature sensor and said humidity sensor and transmitting the sensed temperature and humidity reading to the process controller;
selectively activating said first and second air conditioning units and said dehumidifier for a timed test cycle to determine the resultant temperature and humidity in the building for the selected inputs; and
selectively activating said first and second air conditioning units and said dehumidifier based on the temperature and humidity sensor readouts during the timed test period to further adjust the temperature and humidity in the building responsive to the timed test period for greater comfort or greater efficiency in said building;
whereby the air in the building is conditioned with either increased efficiency for more energy savings or maximum comfort.
1 Assignment
0 Petitions
Accused Products
Abstract
The present invention is a process of controlling a hybrid central air conditioning system that incorporates multiple air treatment devices operated by a process controller reacting to an input of either a comfort or an energy saving program and which uses temperature and humidity sensors that matches specific air treatment machines to varying air treatment needs, such as humidity control to maximize air conditioning performance while minimizing energy use. A timed test cycle is used to make corrections to the selected program based on a timed reading of the temperature and humidity sensors.
-
Citations
16 Claims
-
1. A process for conditioning air in a building comprising the steps of:
-
selecting an air conditioning system in the building having a first air conditioning unit of predetermined capacity and a second air conditioning unit having an equal or smaller capacity than the first air conditioning unit and having a dehumidifier and having a process controller wirelessly connected to each said first and second air conditioner units and to said dehumidifier and having a control panel having energy saving or comfort operating priority inputs and being operatively coupled to said process controller, said air conditioning system also having a temperature sensor for sensing temperature within said building and a humidity sensor for sensing humidity within the building both sensors being operatively connected to said process controller; selectively inputting energy saving and comfort operating priorities into said control panel and into said control processor; sensing the temperature and humidity in said building with said temperature sensor and said humidity sensor and transmitting the sensed temperature and humidity reading to the process controller; selectively activating said first and second air conditioning units and said dehumidifier for a timed test cycle to determine the resultant temperature and humidity in the building for the selected inputs; and selectively activating said first and second air conditioning units and said dehumidifier based on the temperature and humidity sensor readouts during the timed test period to further adjust the temperature and humidity in the building responsive to the timed test period for greater comfort or greater efficiency in said building; whereby the air in the building is conditioned with either increased efficiency for more energy savings or maximum comfort. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A process for treating air inside a building comprising the steps of:
-
selecting an air conditioning system in a building having a first air conditioning unit of predetermined capacity and a second air conditioning unit having an equal or smaller capacity than the first air conditioning unit and having a dehumidifier and having a process controller operatively connected to each said first and second air conditioner units and to said dehumidifier and having a control panel operatively connected to said process controller and having a temperature sensor for sensing temperature within said building and a humidity sensor for sensing humidity within the building both operatively connected to said process controller; sensing the temperature and humidity within the building; selecting either a comfort or energy saving scale on said control panel to activate said process controller; selectively activating said selected air conditioning system first and second air conditioning units and said dehumidifier to run a test cycle and testing the temperature and humidity of the building air responsive to the timed test cycle; and controlling the air in the building responsive to the temperature and humidity of the building air following the timed test cycle with a selected combination of said air conditioning system first and second air conditioning units and said dehumidifier; whereby air inside a building is controlled with increased efficiency over a conventional dedicated air conditioning system. - View Dependent Claims (9, 10, 11, 12, 13, 14, 15, 16)
-
Specification