×

HVAC system grading systems and methods

  • US 9,551,495 B2
  • Filed: 05/06/2015
  • Issued: 01/24/2017
  • Est. Priority Date: 05/07/2014
  • Status: Active Grant
First Claim
Patent Images

1. A grading system comprising:

  • a first tracking module that tracks a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a first predetermined period of time;

    a second tracking module that tracks a second period of time when, during the first predetermined period of time both of the following are satisfied concurrently;

    (i) the HVAC system is ON; and

    (ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system;

    a learning module that, in response to a determination that the split temperature has increased by at least a predetermined amount within a second predetermined period of time after the HVAC system transitions from OFF to ON;

    (i) determines an average split temperature based on an average of two or more of the split temperatures;

    (ii) sets an upper temperature limit of the temperature range of the HVAC system based on the average split temperature plus a first predetermined temperature; and

    (iii) sets a lower temperature limit of the temperature range of the HVAC system based on the average split temperature minus a second predetermined temperature;

    a grade determination module that determines a grade of the HVAC system for the first predetermined period of time based on both the first period of time and the second period of time, wherein the grade determination module decreases the grade of the HVAC system for the first predetermined period as the second period of time increases; and

    a reporting module that generates a displayable report for the HVAC system for the first predetermined period of time, the report including the grade of the HVAC system for the first predetermined period of time.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×