×

Real-time monitoring, controlling, and optimizing electrical generation assets based on emission level measurements

  • US 9,551,981 B2
  • Filed: 10/14/2014
  • Issued: 01/24/2017
  • Est. Priority Date: 03/13/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system implemented in hardware, comprising:

  • a processor executing a manager that operates to;

    receive a subscribe message from at least one subscriber device, wherein the subscribe message is a request to receive updates regarding presence information;

    receive data from a sensor at a power generation facility, wherein the data defines a detected gas emission level of the power generation facility;

    communicate the data defining the detected gas emission level to the at least one subscriber device using Session Initial Protocol (SIP) based communication; and

    transmit a control signal to the power generation facility in response to a determination that the detected gas emission level exceeds a predetermined margin of error of a predicted gas emission level of the power generation facility, wherein the control signal changes power output of the power generation facility.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×