×

Method and apparatus to optimize generator start delay and runtime following outage

  • US 9,563,217 B2
  • Filed: 12/17/2013
  • Issued: 02/07/2017
  • Est. Priority Date: 12/17/2013
  • Status: Active Grant
First Claim
Patent Images

1. A system for providing backup power to a facility, comprising:

  • a generator; and

    a controller configured to;

    determine whether electrical power to the facility has been interrupted; and

    automatically determine a generator restart time delay based at least on a prediction of when an electrical system within the facility needs to be cycled.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×