Cavern pressure management
First Claim
Patent Images
1. A method of pressure management in an underground storage volume, comprising:
- storing a compressible fluid in an underground storage volume,storing an incompressible fluid in said underground storage volume,and introducing additional compressible fluid into said underground storage volume, thereby producing a net pressure increase rate (Pinc) within said underground storage volume,wherein Pinc is maintained at less than a predetermined maximum increase value (PImax), wherein PImax is 100 psi/hr, wherein said compressible fluid is hydrogen.
1 Assignment
0 Petitions
Accused Products
Abstract
A cavern pressure control method includes storing compressible and possibly incompressible fluids in an underground storage volume, removing a portion or introducing additional incompressible fluid into the underground storage volume, possibly removing a portion or introducing additional compressible fluid into the underground storage volume, thereby producing a net pressure increase rate (Pinc) within the underground storage volume, wherein Pinc is maintained at less than a predetermined maximum increase value (PImax).
60 Citations
7 Claims
-
1. A method of pressure management in an underground storage volume, comprising:
-
storing a compressible fluid in an underground storage volume, storing an incompressible fluid in said underground storage volume, and introducing additional compressible fluid into said underground storage volume, thereby producing a net pressure increase rate (Pinc) within said underground storage volume, wherein Pinc is maintained at less than a predetermined maximum increase value (PImax), wherein PImax is 100 psi/hr, wherein said compressible fluid is hydrogen. - View Dependent Claims (2, 3, 4)
-
-
5. A method of pressure management in an underground storage volume, comprising:
-
storing a compressible fluid in an underground storage volume, storing an incompressible fluid in said underground storage volume, and introducing additional incompressible fluid into said underground storage volume, producing a net pressure increase rate (Pinc) within said underground storage volume, wherein Pinc is maintained at less than a predetermined maximum increase value (PImax), wherein PImax is 100 psi/hr, wherein said compressible fluid is hydrogen.
-
-
6. A method of pressure management in an underground storage volume, comprising:
-
storing a compressible fluid in an underground storage volume, storing an incompressible fluid in said underground storage volume, and introducing additional compressible fluid into said underground storage volume, and concurrently, removing a portion of said incompressible fluid from said underground storage volume, thereby producing a net pressure increase rate (Pinc) within said underground storage volume, wherein Pinc is maintained at less than a predetermined maximum increase value (PImax), wherein PImax is 100 psi/hr, wherein said compressible fluid is hydrogen.
-
-
7. A method of pressure management in an underground storage volume, comprising:
-
storing a compressible fluid in an underground storage volume, storing an incompressible fluid in said underground storage volume, and removing a portion of said compressible fluid from said underground storage volume, and concurrently, introducing additional incompressible fluid into said underground storage volume, producing a net pressure increase rate (Pinc) within said underground storage volume, wherein Pinc is maintained at less than a predetermined maximum increase value (PImax), wherein PImax is 100 psi/hr, wherein said compressible fluid is hydrogen.
-
Specification