×

Event response for a shared pool of configurable computing resources which uses a set of dynamically-assigned resources

  • US 9,619,293 B1
  • Filed: 01/03/2016
  • Issued: 04/11/2017
  • Est. Priority Date: 10/23/2015
  • Status: Active Grant
First Claim
Patent Images

1. A system for managing a shared pool of configurable computing resources, the system comprising:

  • a memory having a set of computer readable computer instructions, anda processor for executing the set of computer readable instructions, the set of computer readable instructions including;

    detecting a triggering event related to a resource utilization on a host of the shared pool of configurable computing resources;

    determining, based on a set of profile data, to perform an event response which is selected from a group consisting of at least one of;

    selecting, with respect to a temporal period during which to perform the event response, a resource action in response to the set of profile data indicating to avoid a first virtual machine migration during the temporal period,selecting, with respect to the temporal period during which to perform the event response, an asset action in response to the set of profile data indicating to avoid use of a set of dynamically-assigned resources during the temporal period,selecting, with respect to a workload of a virtual machine on the host, the asset action in response to both;

    the set of profile data indicating to avoid a second virtual machine migration of the virtual machine from the host, and a determination that the resource action is impractical based on a group of factors,selecting, with respect to both the set of dynamically-assigned resources and a donor host, the resource action in response to the set of profile data indicating an assigned resource value exceeds a target resource value for the donor host, andselecting, with respect to the resource action and the asset action, the resource action in response to the set of profile data indicating an expected burden of executing the asset action exceeds an expected burden of executing the resource action; and

    performing the event response to change the resource utilization on the host.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×