×

Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources

  • US 9,639,904 B2
  • Filed: 03/15/2013
  • Issued: 05/02/2017
  • Est. Priority Date: 12/11/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method, comprising:

  • at a computer system having one or more processors and memory storing one or more programs executed by the one or more processors;

    calculating a load prediction arising from an electrical-power consumption entity over a prospective time period;

    calculating a predicted off-grid electrical-power supply from an off-grid electrical-power supply over the prospective time period;

    minimizing, for a respective time interval in a plurality of time intervals, a calculated amount of electrical-power to import from a power grid during the respective time interval, in accordance with output from a cost function, wherein the cost function uses;

    (i) a multi-component time of use tariff schedule associated with the power grid that includes a first power rate during a prospective time period and second power rate during a second time period, wherein the first power rate is other than the second power rate,(ii) the load prediction over the prospective time period,(iii) the predicted off-grid electrical-power supply over the prospective time period, and(iv) a state of a rechargeable battery, wherein the plurality of time intervals collectively accounts for the prospective time period; and

    for at least one interval in the plurality of time intervals,importing, from the power grid, the corresponding calculated amount of electrical-power corresponding to the at least one interval.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×