×

Automated below ground cable installation within a select fill apparatus and method

  • US 9,670,645 B2
  • Filed: 03/06/2015
  • Issued: 06/06/2017
  • Est. Priority Date: 03/06/2014
  • Status: Active Grant
First Claim
Patent Images

1. A apparatus for embedding a cable into a land area, comprising:

  • a hopper;

    a chute extending from a lower end of the hopper;

    wherein the chute comprises a plurality of sidewalls, wherein the plurality of sidewalls each have a lower edge, and wherein each of the lower edges of the plurality of sidewalls defines a lower opening from the chute;

    wherein the chute includes a plowing edge attached to a leading edge of the chute;

    a tube connected to the apparatus for embedding the cable inside the hopper and extending along a major axis of the chute;

    an arch joined to at least one of the lower edges of the plurality of sidewalls of the chute;

    wherein the plowing edge comprises two plates attached together at one end and joined to at least two of the plurality of sidewalls at another respective end defining a triangular compartment for housing the tube;

    a cable extending into the tube proximate the hopper, running through the inner diameter of the tube and emerging at a position proximate and along the lower edges of the plurality of sidewalls of the chute, below and out of the lower opening and the arch;

    a volume of filler material in the apparatus for embedding a cable and flowing out through the lower opening at a position above the cable and continuing to a position around the cable;

    a first vehicle including a trencher attachment, wherein the chute is connected to the first vehicle with an adaptor;

    wherein the adaptor comprises a hydraulic cylinder and a brace, and a rod extendable from the hydraulic cylinder and joined to the plowing edge via a linkage;

    wherein another end of the hydraulic cylinder is connected to an arm attached to the trencher attachment;

    wherein the brace is joined at one end to the trencher attachment and at another end to the plowing edge; and

    a second vehicle including a blade at a position trailing the hopper.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×