System and method for vehicle build verification
First Claim
Patent Images
1. A computer-implemented method for verifying proper installation of equipment systems in a vehicle designed to be assembled in multiple build stages, the method comprising:
- retrieving a data structure describing a build plan for assembling the vehicle, wherein the build plan comprises a plurality of build stages, and wherein the build plan specifies, for each of the plurality of build stages, a respective plurality of prerequisite equipment systems to be installed in the vehicle during the build stage;
determining a current build stage, of the plurality of build stages, of one or more partially constructed vehicle portions of the vehicle;
determining a set of prerequisite equipment systems to be installed in the one or more partially constructed vehicle portions, corresponding to the current build stage;
determining one or more equipment systems that have been installed in the one or more partially constructed vehicle portions during the current build stage, based on build state information for the one or more partially constructed vehicle portions;
determining one or more diagnostic tests that are configured to test for a predefined electrical connectivity of the one or more equipment systems;
emulating, by operation of one or more non-transitory computer processors, data communications, over a data communications network, from one or more prerequisite equipment systems not yet installed in the one or more partially constructed vehicle portions, during the current build stage;
initiating the one or more diagnostic tests, during the current build stage, using the emulated data communications from the one or more prerequisite equipment systems, to determine whether the one or more equipment systems are correctly installed in the vehicle, without requiring the one or more prerequisite equipment systems to be physically installed in the one or more partially constructed vehicle portions; and
upon determining that the one or more systems are incorrectly installed, based on a failure of a first one of the one or more diagnostic tests, facilitating a correction of the failure of the first diagnostic test.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and method for performing build verification of equipment systems after being installed in a partially constructed vehicle portion. After installing one or more of prerequisite equipment systems during a current build stage of a vehicle build plan, the installed equipment systems are tested during the current build stage to determine whether the installed equipment systems are electrically connected correctly.
25 Citations
45 Claims
-
1. A computer-implemented method for verifying proper installation of equipment systems in a vehicle designed to be assembled in multiple build stages, the method comprising:
-
retrieving a data structure describing a build plan for assembling the vehicle, wherein the build plan comprises a plurality of build stages, and wherein the build plan specifies, for each of the plurality of build stages, a respective plurality of prerequisite equipment systems to be installed in the vehicle during the build stage; determining a current build stage, of the plurality of build stages, of one or more partially constructed vehicle portions of the vehicle; determining a set of prerequisite equipment systems to be installed in the one or more partially constructed vehicle portions, corresponding to the current build stage; determining one or more equipment systems that have been installed in the one or more partially constructed vehicle portions during the current build stage, based on build state information for the one or more partially constructed vehicle portions; determining one or more diagnostic tests that are configured to test for a predefined electrical connectivity of the one or more equipment systems; emulating, by operation of one or more non-transitory computer processors, data communications, over a data communications network, from one or more prerequisite equipment systems not yet installed in the one or more partially constructed vehicle portions, during the current build stage; initiating the one or more diagnostic tests, during the current build stage, using the emulated data communications from the one or more prerequisite equipment systems, to determine whether the one or more equipment systems are correctly installed in the vehicle, without requiring the one or more prerequisite equipment systems to be physically installed in the one or more partially constructed vehicle portions; and upon determining that the one or more systems are incorrectly installed, based on a failure of a first one of the one or more diagnostic tests, facilitating a correction of the failure of the first diagnostic test. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32)
-
-
33. A system, comprising:
-
one or more computer processors; and a non-transitory memory containing computer program code that, when executed by operation of the one or more computer processors, performs an operation for verifying proper installation of equipment systems in a vehicle designed to be assembled in multiple build stages, the operation comprising; retrieving a data structure describing a build plan for assembling the vehicle, wherein the build plan comprises a plurality of build stages, and wherein the build plan specifies, for each of the plurality of build stages, a respective plurality of prerequisite equipment systems to be installed in the vehicle during the build stage; determining a current build stage, of the plurality of build stages, of one or more partially constructed vehicle portions of the vehicle; determining a set of prerequisite equipment systems to be installed in the one or more partially constructed vehicle portions, corresponding to the current build stage; determining one or more equipment systems that have been installed in the one or more partially constructed vehicle portions during the current build stage, based on build state information for the one or more partially constructed vehicle portions; determining one or more diagnostic tests that are configured to test for a predefined electrical connectivity of the one or more equipment systems; emulating data communications, over a data communications network, from one or more prerequisite equipment systems not yet installed in the one or more partially constructed vehicle portions, during the current build stage; initiating the one or more diagnostic tests, during the current build stage, using the emulated data communications from the one or more prerequisite equipment systems, to determine whether the one or more equipment systems are correctly installed in the vehicle, without requiring the one or more prerequisite equipment systems to be physically installed in the one or more partially constructed vehicle portions; and upon determining that the one or more systems are incorrectly installed, based on a failure of a first one of the one or more diagnostic tests, facilitating a correction of the failure of the first diagnostic test. - View Dependent Claims (34, 35)
-
-
36. A non-transitory computer-readable storage medium containing computer program code that, when executed by operation of one or more computer processors, performs an operation comprising:
-
retrieving a data structure describing a build plan for assembling the vehicle, wherein the build plan comprises a plurality of build stages, and wherein the build plan specifies, for each of the plurality of build stages, a respective plurality of prerequisite systems to be installed in the vehicle during the build stage; determining a current build stage, of the plurality of build stages, of one or more partially constructed vehicle portions of the vehicle; determining a set of prerequisite equipment systems to be installed in the one or more partially constructed vehicle portions, corresponding to the current build stage; determining one or more equipment systems that have been installed in the one or more partially constructed vehicle portions during the current build stage, based on build state information for the one or more partially constructed vehicle portions; determining one or more diagnostic tests that are configured to test for a predefined electrical connectivity of the one or more equipment systems; emulating, by operation of one or more non-transitory computer processors, data communications, over a data communications network, from one or more prerequisite equipment systems not yet installed in the one or more partially constructed vehicle portions, during the current build stage; initiating the one or more diagnostic tests, during the current build stage, using the emulated data communications of the one or more prerequisite equipment systems, to determine whether the one or more equipment systems are correctly installed in the vehicle, without requiring the one or more prerequisite equipment systems to be physically installed in the one or more partially constructed vehicle portions; and upon determining that the one or more systems are incorrectly installed, based on a failure of a first one of the one or more diagnostic tests, facilitating a correction of the failure of the first diagnostic test. - View Dependent Claims (37, 38, 39, 40)
-
-
41. A computer-implemented method for verifying proper installation of equipment systems of a primary power busing network within a first modular equipment center (MEC), the method comprising, by operation of one or more non-transitory computer processors:
-
emulating, by operation of one or more non-transitory computer processors, data communications, over a data communications network, from one or more prerequisite equipment systems not yet installed in the one or more partially constructed vehicle portions, during the current build stage; initiating one or more diagnostic tests, during the current build stage of the vehicle, using the emulated data communications of one or more prerequisite equipment systems, to determine whether one or more equipment systems of the primary power busing network within the MEC are correctly installed in the vehicle, without requiring the one or more prerequisite equipment systems to be physically installed in the one or more partially constructed vehicle portions, comprising; routing a low voltage test power to a first plurality of contactors within the first MEC; determining whether or not the low voltage test power is present at each of the first plurality of contactors of the first MEC; and collecting contactor information from each of the first plurality of contactors across an internal MEC data network of the first MEC to a CNI module of the first MEC; and upon determining that the one or more equipment systems are incorrectly installed, based on a failure of a first one of the one or more diagnostic tests, facilitating a correction of the failure of the first diagnostic test. - View Dependent Claims (42, 43, 44, 45)
-
Specification