×

Method and apparatus in an electricity distribution network

  • US 9,678,527 B2
  • Filed: 04/20/2011
  • Issued: 06/13/2017
  • Est. Priority Date: 04/20/2011
  • Status: Active Grant
First Claim
Patent Images

1. A network element in an electricity distribution network, the network element comprising a memory and one or more processors connected to the memory, wherein the one or more processors are arranged to:

  • create a plurality of sequence skeletons including a first sequence skeleton and a second sequence skeleton, whereinA) the first sequence skeleton identifies one or more of;

    i) a first set of one or more controllable devices that should be activated, ii) a first set of one or more controllable devices that should be inactivated, iii) a first set of one or more controllable device categories for identifying one more controllable devices that should be activated, and iv) a first set of one or more controllable device categories for identifying one more controllable devices that should be activated andB) the second sequence skeleton identifies one or more of;

    i) a second set of one or more controllable devices that should be activated, ii) a second set of one or more controllable devices that should be inactivated, iii) a second set of one or more controllable device categories for identifying one more controllable devices that should be activated, and iv) a second set of one or more controllable device categories for identifying one more controllable devices that should be activated;

    associate the first sequence skeleton with a first power consumption value;

    associate the second sequence skeleton with a second power consumption value;

    identify a plurality of controllable devices connected to the electricity distribution network;

    determine one or more capabilities of the plurality of controllable devices;

    receive an indication of a target power consumption value;

    compare the received target consumption value with the first power consumption value;

    compare the received target consumption value with the second power consumption value when the target power consumption value does not match the first power consumption value;

    select the second sequence skeleton when the target power consumption value matches the second power consumption value; and

    send instructions towards each controllable device identified by the selected sequence skeleton to meet the target power consumption value, whereinthe one or more processors arranged to calculate a plurality of sequence skeletons comprising which of the plurality of controllable devices connected to the electricity distribution network should be activated and which should be inactivated to meet each of a respective plurality of target power consumption values, wherein each of the plurality of target power consumption values identifies a different target power consumption.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×