×

Method for determining an optimal schedule of an appliance

  • US 9,686,093 B2
  • Filed: 09/10/2013
  • Issued: 06/20/2017
  • Est. Priority Date: 09/10/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method of defining a message to be sent to at least one appliance regarding a schedule for performing a cycle of operation, the method comprising:

  • acquiring pricing data from a source of information about a resource consumed by the appliance while performing the cycle of operation;

    obtaining a user preference for a tradeoff factor where the tradeoff factor is indicative of at least one of a user'"'"'s desire to save money or a user'"'"'s reluctance to delay a cycle of operation for the appliance;

    calculating at least one projected rate for the use of the resource by the appliance for a future series of time periods to define a series of projected rates;

    assigning a delay request to selected time periods based on the tradeoff factor and the projected rate;

    creating a projected schedule for performing the cycle of operation for the future series of time periods where the projected schedule incorporates the delay request assigned to the selected time periods;

    incorporating the projected schedule into the message;

    and transmitting to the appliance the message so that the appliance performs the cycle of operation based on the projected schedule;

    wherein the tradeoff factor is used to determine a rate threshold above which the delay request is assigned and the rate threshold is a summation of I) an average of the series of projected rates and II) a product of the tradeoff factor and a standard deviation of the series of projected rates.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×