Election and use of configuration manager
First Claim
Patent Images
1. A method for election of a managing node for a network, the method comprising:
- detecting, by one or more processors, that a first set of background tasks is not running, wherein the first set of background tasks are re-entrant and have not failed;
identifying, by the one or more processors, at least a first node in a network and information about the first node, wherein the first node is capable of performing the first set of background tasks, determined, at least in part by information associated with the first node;
electing, by the one or more processors, the first node as the managing node in the network to perform the first set of background tasks; and
performing, by the one or more processors, the first set of background tasks by the first node to a first plurality of components within the network wherein the first set of background tasks comprise;
identifying, by the managing node, the first plurality of components of the network;
detecting, by the managing node, miswiring between at least two components of the first plurality of components of the network;
configuring, by the managing node, the network to correct the miswiring;
comparing, by the managing node, the first plurality of components of the network to a past configuration of a second plurality of components of the network;
based on the comparison of the first plurality of components to the past configuration determining, by the managing node, a change to the power status of the first plurality of components; and
controlling, by the managing node, power to the first plurality of components of the network, wherein controlling the power comprises switching the power to the component on and switching the power to the component off, such that, at least, if a component of the first plurality of components is not in use, the power to the component is switched off.
1 Assignment
0 Petitions
Accused Products
Abstract
In an approach for election of a manger for a network, a processor detects that a first set of management tasks is not running. A processor identifies at least a first node in a network and information about the first node. A processor determines that the first node is capable of performing the first set of management tasks based on the information about the first node. A processor elects the first node as a manager in the network to perform the first set of management tasks.
-
Citations
11 Claims
-
1. A method for election of a managing node for a network, the method comprising:
-
detecting, by one or more processors, that a first set of background tasks is not running, wherein the first set of background tasks are re-entrant and have not failed; identifying, by the one or more processors, at least a first node in a network and information about the first node, wherein the first node is capable of performing the first set of background tasks, determined, at least in part by information associated with the first node; electing, by the one or more processors, the first node as the managing node in the network to perform the first set of background tasks; and performing, by the one or more processors, the first set of background tasks by the first node to a first plurality of components within the network wherein the first set of background tasks comprise; identifying, by the managing node, the first plurality of components of the network; detecting, by the managing node, miswiring between at least two components of the first plurality of components of the network; configuring, by the managing node, the network to correct the miswiring; comparing, by the managing node, the first plurality of components of the network to a past configuration of a second plurality of components of the network; based on the comparison of the first plurality of components to the past configuration determining, by the managing node, a change to the power status of the first plurality of components; and controlling, by the managing node, power to the first plurality of components of the network, wherein controlling the power comprises switching the power to the component on and switching the power to the component off, such that, at least, if a component of the first plurality of components is not in use, the power to the component is switched off. - View Dependent Claims (2, 3, 4)
-
-
5. A computer program product for election of a managing node for a network, the computer program product comprising:
one or more non-transitory computer readable storage media and program instructions stored on the one or more non-transitory computer readable storage media, the program instructions comprising; program instructions to detect that a first set of background tasks is not running, wherein the first set of background tasks are re-entrant and have not failed; program instructions to identify at least a first node in a network and information about the first node, wherein the first node is capable of performing the first set of background tasks, determined, at least in part by information associated with the first node; program instructions to elect the first node as the managing node in the network to perform the first set of background tasks; and program instructions, to perform the first set of background tasks by the first node to a first plurality of components within the network wherein the first set of background tasks comprise; program instructions to identify the first plurality of components of the network; program instructions to detect miswiring between at least two components of the first plurality of components of the network; program instructions to configure the network to correct the miswiring; program instructions to compare the first plurality of components of the network to a past configuration of a second plurality of components of the network; program instructions to determine a change to the power status of the first plurality of components based on the comparison of the first plurality of components to the past configuration; and program instructions to control power to the first plurality of components of the network, wherein controlling the power comprises switching the power to the component on and switching the power to the component off, such that, at least, if a component of the first plurality of components is not in use, the power to the component is switched off. - View Dependent Claims (6, 7, 8)
-
9. A computer system for election of a managing node for a network, the computer system comprising:
one or more computer processors, one or more non-transitory computer readable storage media, and program instructions stored on the one or more computer non-transitory readable storage media for execution by at least one of the one or more processors, the program instructions comprising; program instructions to detect that a first set of background tasks is not running, wherein the first set of background tasks are re-entrant and have not failed; program instructions to identify at least a first node in a network and information about the first node, wherein the first node is capable of performing the first set of background tasks, determined, at least in part by information associated with the first node; program instructions to elect the first node as the managing node in the network to perform the first set of background tasks; and program instructions to perform the first set of background tasks by the first node to a first plurality of components within the network wherein the first set of background tasks comprise; program instructions to identify the first plurality of components of the network; program instructions to detect miswiring between at least two components of the first plurality of components of the network; program instructions to configure the network to correct the miswiring; program instructions to compare the first plurality of components of the network to a past configuration of a second plurality of components of the network; program instructions to determine a change to the power status of the first plurality of components based on the comparison of the first plurality of components to the past configuration; and program instructions to control power to the first plurality of components of the network, wherein controlling the power comprises switching the power to the component on and switching the power to the component off, such that, at least, if a component of the first plurality of components is not in use, the power to the component is switched off. - View Dependent Claims (10, 11)
Specification