×

Broken rail detection system for railway systems

  • US 9,701,326 B2
  • Filed: 09/12/2014
  • Issued: 07/11/2017
  • Est. Priority Date: 09/12/2014
  • Status: Active Grant
First Claim
Patent Images

1. A broken rail detection system for a portion of a railway track having a first and second opposing rail, each supported by at least one railroad tie and ballast material, the system comprising:

  • a power module positioned at a first end of the portion of the railway track, the power module comprising;

    (1) a first electrical connection to the first rail and configured to apply a direct current voltage to the first rail; and

    (2) a second electrical connection to the second rail and configured to apply a direct current voltage to the second rail;

    a at least one diode shunt arrangement positioned at a distance from the at least one power module;

    at least one measurement device configured to sense or measure current resulting from the application of the direct current voltage from the first electrical connection and the second electrical connection; and

    at least one controller in direct or indirect communication with the at least one power module and the at least one measurement device and programmed or configured to;

    (i) cause at least one application of a direct current voltage of a first polarity on the railway track through the first electrical connection and second electrical connection;

    (ii) determine the current resulting from the application step (i) using the at least one measurement device;

    (iii) cause at least one application of a direct current voltage of a second polarity on the railway track through the first electrical connection and the second electrical connection;

    (iv) determine the current resulting from the application step (iii) using the at least one measurement device; and

    (v) determine the presence or absence of a break in at least one of the first and second rail based at least partially on the current determined in steps (ii) and (iv).

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×