×

Data center intelligent control and optimization

  • US 9,709,965 B2
  • Filed: 03/07/2013
  • Issued: 07/18/2017
  • Est. Priority Date: 12/04/2008
  • Status: Expired due to Fees
First Claim
Patent Images

1. A data center control and optimization system, comprising:

  • a memory, the memory in communication with a processor, the processor when executing a computer program for data center control and optimization, performs operations comprising;

    accessing, by the processor, input data associated with data center operations, wherein the input data comprises inventory data, operational data, historical data and external data;

    identifying and analyzing the input data based on a plurality of optimization dimensions, the plurality of optimization dimensions including at least a redundancy optimization dimension and a latency optimization dimension;

    selecting, by the processor, at least one data center optimization dimension from the plurality of optimization dimensions, the selected at least one data center optimization dimension including at least the redundancy optimization dimension,forecasting, by the processor and based upon at least a portion of the input data, to produce predictive data associated with the selected redundancy optimization dimension;

    identifying a plurality of optimization actions based on the input data and the predictive data associated with the selected redundancy optimization dimension;

    determining, for each optimization action, a respective optimization score based upon the selected redundancy optimization dimension;

    selecting, by the processor without operator interaction and based upon the selected redundancy optimization dimension, the predictive data, the input data, and the optimization scores, the optimization action; and

    generating, by the processor without operator interaction, an optimization instruction based upon the selected redundancy optimization action and executing the optimization instruction to modify at least one asset of the data center.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×