×

Utility usage forecasting

  • US 9,739,908 B2
  • Filed: 01/07/2014
  • Issued: 08/22/2017
  • Est. Priority Date: 01/07/2014
  • Status: Active Grant
First Claim
Patent Images

1. A method for creating a utility demand forecast model for weather parameters, the method comprising:

  • receiving, by one or more processors, a plurality of utility parameter values, wherein each utility parameter value out of the plurality of utility parameter values corresponds to a weather parameter value;

    determining, by one or more processors, that a range of weather parameter values lacks a sufficient amount of corresponding utility parameter values out of the plurality of utility parameters;

    determining, by one or more processors, a set of utility parameter values that corresponds to the range of weather parameter values based on a portion of the plurality of utility parameter values corresponding to the range of weather parameter values lacking a sufficient amount of corresponding utility parameter values;

    creating, by one or more processors, a model which correlates the plurality of utility parameter values and the set of utility parameter values with corresponding weather parameters values; and

    providing, by one or more processors, an amount of a utility to one or more structures based on the model.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×