×

Tension monitoring arrangement and method

  • US 9,778,121 B2
  • Filed: 01/30/2016
  • Issued: 10/03/2017
  • Est. Priority Date: 05/24/2002
  • Status: Expired due to Fees
First Claim
Patent Images

1. In a system for installing an underground utility by retraction that is applied to a leading end of the utility to draw the utility through the ground such that the utility is subjected to a tension force, said system including an inground tension monitoring arrangement having a processor which receives electrical power from a power supply in a way which subjects the processor to a loss of power that is temporary during system operation, as well as a shut-down loss of power condition, either of which causes the processor to reset, an apparatus comprising:

  • a detector for producing an output voltage that is responsive to a time duration of the loss of power; and

    said processor configured for comparing the output voltage, subsequent to a reset, to a threshold value to establish whether the reset is responsive to a power supply bounce condition during operation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×