Working machine and method of measuring work amount of working machine
First Claim
1. A working machine comprising:
- a controller that is;
configured to detect a physical amount output according to an operation of an operation lever,configured to calculate a time integration value by performing time integration of the physical amount,configured to cause the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed at a time the time integration value becomes a predetermined integration value or more, andconfigured to count, when a determined operation of the excavating and loading mechanism is performed in a predetermined order, number of times of excavating and loading work, treating the operation of the excavating and loading mechanism performed in the predetermined order, as one time, whereinthe operation of the excavating and loading mechanism includes at least an excavating operation and a swing operation.
1 Assignment
0 Petitions
Accused Products
Abstract
A working machine includes: an operation state detection unit configured to detect a physical amount output according to an operation of an operation lever; a time integration unit configured to calculate a time integration value by performing time integration of the physical amount; a determination unit configured to cause the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed at a time the time integration value becomes a predetermined integration value or more; and a counting unit configured to count at a time operations of the excavating and loading mechanism determined by the determination unit are performed in a predetermined order, number of times of excavating and loading work.
41 Citations
9 Claims
-
1. A working machine comprising:
-
a controller that is; configured to detect a physical amount output according to an operation of an operation lever, configured to calculate a time integration value by performing time integration of the physical amount, configured to cause the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed at a time the time integration value becomes a predetermined integration value or more, and configured to count, when a determined operation of the excavating and loading mechanism is performed in a predetermined order, number of times of excavating and loading work, treating the operation of the excavating and loading mechanism performed in the predetermined order, as one time, wherein the operation of the excavating and loading mechanism includes at least an excavating operation and a swing operation. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A computer-implemented method of measuring a work amount of a working machine, the computer-implemented method comprising:
-
detecting a physical amount output according to an operation of an operation lever; calculating a time integration value by performing time integration of the physical amount; causing the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed, when the time integration value becomes a predetermined integration value or more; and counting, when a determined operation of the excavating and loading mechanism is performed in a predetermined order, number of times of excavating and loading work, treating the operation of the excavating and loading mechanism performed in the predetermined order, as one time, wherein the operation of the excavating and loading mechanism includes at least an excavating operation and a swing operation.
-
Specification