×

Forecasting and scheduling campaigns involving different channels of communication

  • US 9,787,840 B1
  • Filed: 06/11/2015
  • Issued: 10/10/2017
  • Est. Priority Date: 06/11/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method for generating a roster template for use in scheduling agent resources for a contact center to conduct a first campaign and a second campaign, the method comprising the steps of:

  • defining a first set of campaign parameters for the first campaign, the first set of campaign parameters comprising (1) a first channel of communication to be used in conducting the first campaign and (2) a first time period during which the first campaign is to be conducted;

    defining a second set of campaign parameters for the second campaign, the second set of campaign parameters comprising (1) a second channel of communication to be used in conducting the second campaign, in which the second channel of communication is different than the first channel of communication and (2) a second time period during which the second campaign is to be conducted, in which at least a corresponding portion of each of the second time period and the first time period overlap each other;

    selecting a first historical dataset for the first campaign comprising historical data on handling communications involving the first channel of communication during a first historical time period;

    selecting a second historical dataset for the second campaign comprising historical data on handling communications involving the second channel of communication during a second historical time period;

    generating by a workforce management system a first forecast based on the first historical dataset and the first set of campaign parameters, the first forecast identifying a first number of communications involving the first channel of communication forecasted to be at least one of received and sent during the first time period;

    identifying by the workforce management system a first number of agent resources needed to handle the first number of communications;

    generating by the workforce management system a second forecast based on the second historical dataset and the second set of campaign parameters, the second forecast identifying a second number of communications involving the second channel of communication forecasted to be at least one of received and sent during the second time period;

    identifying by the workforce management system a second number of agent resources needed to handle the second number of communications;

    generating a roster template by the workforce management system, the roster template comprising one or more shifts identifying agent resources to schedule based on the first number of agent resources needed to handle the first number of communications forecasted to be at least one of received and sent during the first time period for the first campaign;

    evaluating the roster template by the workforce management system to identify a first deficiency in which the agent resources identified in the one or more shifts to schedule do not meet the second number of agent resources needed to handle the second number of communications forecasted to be at least one of received and sent during the second time period for the second campaign;

    determining whether to address the first deficiency by the workforce management system based on the first deficiency causing one or more requirements set forth by a first defined parameter not to be met; and

    after determining to address the first deficiency, revising the one or more shifts identifying the agent resources to schedule for the roster template by the workforce management system to address the first deficiency so that;

    (1) the one or more requirements set forth by the first defined parameter are met, and(2) a second deficiency is not created in which the agent resources identified in the revised one or more shifts to schedule do not meet the first number of agent resources needed to handle the first number of communications forecasted to be at least one of received and sent during the first time period for the first campaign causing one or more requirements set forth by a second defined parameter not to be met.

View all claims
  • 10 Assignments
Timeline View
Assignment View
    ×
    ×