Arc-fault and ground fault interrupter using a single ground fault sensor and single ADC
First Claim
1. A method of performing arc-fault sampling, ground-fault sampling, and grounded-neutral fault sampling in a circuit breaker device, comprising:
- performing the arc-fault sampling during a plurality of arc-fault sampling periods, the arc-fault sampling periods occurring at regular intervals and each arc-fault sampling period lasting a fixed duration that is shorter than the time in between consecutive arc-fault sampling periods;
monitoring for an occurrence of a predefined event in the circuit breaker device, the predefined event being timed to occur coincident with one of the plurality of arc-fault sampling periods; and
performing the grounded-neutral fault sampling near the occurrence of the predefined event such that the grounded-neutral fault sampling is performed between said one of the plurality of arc-fault sampling periods and an immediately adjacent arc-fault sampling period;
wherein the arc-fault sampling, ground-fault sampling, and the grounded-neutral fault sampling are performed during a common detection interval.
1 Assignment
0 Petitions
Accused Products
Abstract
Sampling for arc-fault detection, ground-fault detection, and grounded-neutral fault detection uses a single analog-to-digital converter (ADC). The arc-fault and ground-fault sampling occurs at regular sampling periods that are relatively short com pared to the time between them, thus allowing grounded-neutral fault sampling to occur before and/or after one of these sampling periods. A predefined event may be used to ensure the grounded-neutral fault sampling occurs immediately before and/or after one of the periodic sampling periods. The predefined event may be the expiration of a timer or the time for a sinusoidal signal in a ground fault sense circuit to make a predefined number of zero-crossings. This avoids interference between the arc-fault sampling, the ground-fault sampling and grounded-neutral fault sampling, allowing a single ADC to perform all samplings concurrently. The timing of the predefined event may be periodically reset to compensate for any changes due to temperature and/or over time.
12 Citations
20 Claims
-
1. A method of performing arc-fault sampling, ground-fault sampling, and grounded-neutral fault sampling in a circuit breaker device, comprising:
-
performing the arc-fault sampling during a plurality of arc-fault sampling periods, the arc-fault sampling periods occurring at regular intervals and each arc-fault sampling period lasting a fixed duration that is shorter than the time in between consecutive arc-fault sampling periods; monitoring for an occurrence of a predefined event in the circuit breaker device, the predefined event being timed to occur coincident with one of the plurality of arc-fault sampling periods; and performing the grounded-neutral fault sampling near the occurrence of the predefined event such that the grounded-neutral fault sampling is performed between said one of the plurality of arc-fault sampling periods and an immediately adjacent arc-fault sampling period; wherein the arc-fault sampling, ground-fault sampling, and the grounded-neutral fault sampling are performed during a common detection interval. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A system for performing arc-fault sampling, ground-fault sampling, and grounded-neutral fault sampling in an circuit breaker device, comprising:
-
a single system controller programmed to perform the arc-fault sampling, ground-fault sampling, and the grounded-neutral fault sampling during a common detection interval; a ground fault sense circuit connected to the system controller and configured to provide ground-fault sensor input and grounded-neutral fault sensor input to the system controller for performing the ground-fault sampling and the grounded-neutral sampling; and an arc-fault sense circuit connected to the system controller and configured to provide arc-fault sensor input to the system controller for the performing arc-fault sampling; wherein the single system controller is configured to monitor for an occurrence of a predefined event in the circuit breaker device and perform the grounded-neutral fault sampling near the occurrence of the predefined event such that the grounded-neutral fault sampling is performed between one of a plurality of arc-fault sampling periods and an immediately adjacent arc-fault sampling period. - View Dependent Claims (10, 11, 12, 13, 14, 15)
-
-
16. A controller in a circuit breaker device configured to perform arc-fault sampling and grounded-neutral fault sampling, comprising:
-
an analog-to-digital converter module (ADC) having a single input and a single output, the ADC configured to receive arc-fault sensor signals, ground-fault sensor signals, and a grounded-neutral fault sensor signal, the grounded-neutral fault sensor signal including a decaying sinusoidal signal; a comparator module configured to receive the grounded-neutral fault sensor signal and to detect zero-crossings made by the decaying sinusoidal signal; an input capture module configured to receive an indication of a zero-crossing detected by the comparator module and capture a timestamp for the zero-crossing; and an output compare module configured to initiate the decaying sinusoidal signal received by the ADC and the comparator; the controller being configured to; operate the output compare module to initiate the decaying sinusoidal signal; operate the ADC to receive the decaying sinusoidal signal; operate the comparator module to detect zero-crossings made by the decaying sinusoidal signal; and operate the input capture module to obtain a timestamp for a zero-crossing; the controller being further configured to monitor for a predefined zero-crossing and perform the grounded-neutral fault sampling predefined zero-crossing, the predefined zero-crossing occurring coincident in time with one of a plurality of arc-fault sampling periods such that the grounded-neutral fault sampling is performed between said one of the plurality of arc-fault sampling periods and an immediately adjacent arc-fault sampling period; wherein the arc-fault sampling, grounded-fault sampling, and the grounded-neutral fault sampling are performed during a shared detection interval. - View Dependent Claims (17, 18, 19, 20)
-
Specification