Methods of automatically recording patching changes at passive patch panels and network equipment
First Claim
Patent Images
1. A method of executing a patching connection change, the method comprising:
- receiving an electronic work order requesting the patching connection change;
displaying the electronic work order on a display device that is located in a patching field where the requested patching connection change is to occur;
performing the patching connection change;
transmitting a message to a system controller; and
updating a connectivity database to reflect the completion of the patching connection change in response to receiving the message,wherein the display device comprises a display of a mobile system controller that includes a camera that is used to detect patch cord insertions and removals, and wherein the camera is used in reading identifier on a piece of equipment that is involved in the patching connection change and is further used to identify a connector port on the piece of equipment that was involved in the patching connection change.
5 Assignments
0 Petitions
Accused Products
Abstract
Methods of executing patching connection changes in a patching field are provided in which an electronic work order is received on a display located at the patching field, the electronic work order specifying the patching connection change. A technician may perform the patching connection change. Then, an electronic message may be sent from the patching field indicating that the patching change has been completed.
53 Citations
5 Claims
-
1. A method of executing a patching connection change, the method comprising:
-
receiving an electronic work order requesting the patching connection change; displaying the electronic work order on a display device that is located in a patching field where the requested patching connection change is to occur; performing the patching connection change; transmitting a message to a system controller; and updating a connectivity database to reflect the completion of the patching connection change in response to receiving the message, wherein the display device comprises a display of a mobile system controller that includes a camera that is used to detect patch cord insertions and removals, and wherein the camera is used in reading identifier on a piece of equipment that is involved in the patching connection change and is further used to identify a connector port on the piece of equipment that was involved in the patching connection change. - View Dependent Claims (2, 3)
-
-
4. A method of tracking patching connection changes, the method comprising:
-
using an optical scanner to optically scan device identifiers on devices mounted on one or more equipment racks and patch cord identifiers on patch cords that are plugged into connector ports on the devices; and comparing an image of a first of the devices to stored image information regarding the first of the devices to determine the connector ports on the first of the devices that each patch cord is plugged into; mapping the patching connections based on the scanned identifiers; and updating a connectivity database to reflect the mapped patching connections, wherein the device identifiers each identify a specific device. - View Dependent Claims (5)
-
Specification