×

Apparatus and method for managing comfort in a demand coordination network

  • US 9,817,421 B2
  • Filed: 11/19/2014
  • Issued: 11/14/2017
  • Est. Priority Date: 08/31/2011
  • Status: Active Grant
First Claim
Patent Images

1. An apparatus for controlling peak demand of a resource and managing comfort within a facility, the apparatus comprising:

  • a plurality of devices, disposed within the facility, each device consuming a portion of the resource when turned on, and said each device capable of performing a corresponding function by cycling on and off to maintain a level of comfort;

    a network operations center (NOC), disposed external to the facility, said NOC configured to generate a plurality of run time schedules, wherein said plurality of run time schedules coordinates run times for said each of said plurality of devices to control the peak demand of the resource, and wherein activation of one or more of said plurality of devices is substituted with a different activation time in order to maintain said level of comfort; and

    a plurality of control nodes, disposed within the facility, each control node coupled to a corresponding one of said plurality of devices, wherein said plurality of control nodes is coupled together via a demand coordination network, wherein said demand coordination network is operatively coupled to said NOC, and wherein said plurality of control nodes transmits sensor data and device status to said NOC via said demand coordination network for generation of said plurality of run time schedules, and wherein said plurality of control nodes executes selected ones of said run time schedules to cycle said plurality of devices on and off.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×