Managing information at a construction site

  • US 9,817,839 B2
  • Filed: 11/29/2012
  • Issued: 11/14/2017
  • Est. Priority Date: 11/29/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method for managing information at a construction site comprising:

  • receiving in real-time task data from a handheld tool at a construction site, the task data comprising the position and orientation of said handheld tool and information identifying an operator of said handheld tool, wherein said task data is captured by said handheld tool and provides metrics for determining how well a task has been performed by said handheld tool and which operator performed said task with said handheld tool, and wherein said handheld tool is selected from the group consisting of;

    a handheld drilling tool, a handheld cutting tool, a handheld sawing tool, and a handheld fastener installation tool;

    populating a database with the task data such that the task data can be retrieved from said database;

    using the task data to generate at least one report;

    determining that said operator is not qualified to perform said task using said handheld tool;

    generating a message via said report preventing said operator from performing said task; and

    using the at least one report generated from the task data received from said handheld tool to enable or disable said handheld tool based on an identification of said operator and the position and orientation of said handheld tool.

View all claims