×

System for contextualizing and resolving alerts

  • US 9,865,156 B2
  • Filed: 09/23/2015
  • Issued: 01/09/2018
  • Est. Priority Date: 09/23/2015
  • Status: Active Grant
First Claim
Patent Images

1. A computer implemented system configured to generate a contextualized alert related to an alert resolution process in an industrial process control system, the computer implemented system comprising:

  • an asset repository storing asset-specific data for a plurality of industrial process assets of the industrial process control system, the asset-specific data comprising alert response data, asset identification data and alert prioritization data;

    a diagnostic contextualization component coupled to the asset repository and configured for generating an alert resolution status of the contextualized alert by performing the steps of;

    receiving an asset parameter descriptive of a condition of a first asset of the plurality of industrial process assets, from an asset monitoring system;

    retrieving the asset identification data for the first asset from the asset repository to interpret the received asset parameter;

    retrieving the alert prioritization data for the first asset from the asset repository based on the retrieved asset identification data;

    determining the condition of the first asset by interpreting the received asset parameter based on the retrieved asset identification data and the retrieved alert prioritization data, wherein the determination distinguishes, based on the retrieved asset identification data and the retrieved alert prioritization data, the condition of the first asset as described by the received asset parameter from a different condition of a second asset of the plurality industrial process assets as described by the asset parameter;

    generating the contextualized alert based on the retrieved asset identification data and the retrieved alert prioritization data, wherein the contextualized alert includes asset-related data, wherein the asset-related data includes one or more of the following;

    details of the determined condition, a context of the asset monitoring system, documentation data specific to the first asset, and historical information about previous maintenance of the first asset;

    determining whether an actionable output related to the contextualized alert has been received by the diagnostic contextualization component, the actionable output addressing the condition of the first asset while adhering to a general maintenance plan; and

    generating the alert resolution status based on the determination of whether the actionable output has been received to enable a dashboard to display the contextualized alert in a list of alerts ordered by severity based on the retrieved alert prioritization data in a manner that provides information necessary to resolve the condition of the first asset while adhering to the general maintenance plan which is applicable to all of the plurality of industrial process assets.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×