×

Fabric switchover for systems with control plane and fabric plane on same board

  • US 9,866,428 B2
  • Filed: 05/29/2015
  • Issued: 01/09/2018
  • Est. Priority Date: 03/18/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • verifying links between a first fabric plane and input/output units of a network device that includes a first control card and a second control card;

    detecting, by a first control plane of the first control card and after verifying the links between the first fabric plane and the input/output units, a first failure of a second control plane, of the second control card, while the first control plane is in standby,the first control card including the first control plane and the first fabric plane, andthe second control card including the second control plane and a second fabric plane;

    switching, by the first control plane and based on the first control plane detecting the first failure of the second control plane, the first control plane from being in standby to being active;

    detecting, by the first control plane, a second failure of the second fabric plane; and

    initiating, by the first control plane and based on detecting the second failure of the second fabric plane, a switchover to the first fabric plane without again verifying the links with the input/output units after detecting the second failure of the second fabric plane and before initiating the switchover to the first fabric plane.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×