Electricity suppressing type electricity and heat optimizing control device, optimizing method, and optimizing program
First Claim
1. An electricity suppressing type electricity and heat optimizing control device comprising:
- an energy predictor configured to set, for at least one of control-target devices which are an energy supplying device supplying energy, an energy consuming device consuming energy, and an energy storing device storing energy, a predicted value of consumed energy of the energy consuming device or of supplied energy of the energy supplying device within a predetermined future time period;
an incentive acceptance determiner configured to determine a time that an incentive is receivable by a reduction of electricity usage based on the predicted value, an electricity suppression target time that is a time prepared for applying an incentive to electricity suppression, and a base line that is a threshold for whether or not to apply the incentive;
an electricity suppressing schedule optimizer configured to plan the operating schedule of the control-target device within the predetermined future time period so as to minimize a predetermined evaluation barometer that is a required cost for an energy when the control-target device is activated based on the predicted value, a characteristic of the control-target device, and a unit price of an energy usage fee which is increased so as to reduce a possibility to be selected by adding an incentive unit price to the unit price of an energy usage fee at a time at which incentive is determined receivable;
a schedule optimizer configured to plan an operating schedule of the control-target device within the predetermined future time period so as to minimize the predetermined evaluation barometer based on the predicted value, the characteristic of the control-target device, and the unit price of an energy usage fee without the incentive;
an adopted schedule selector configured to select either the operating schedule planned by the electricity suppressing schedule optimizer or the operating schedule planned by the schedule optimizer based on the predetermined evaluation barometer or a selection instruction input externally; and
a rescheduling necessity determiner configured to determine whether or not it is necessary to optimize the operating schedule again based on the operating schedule, and operation data of the control-target device operated based on the operating schedule.
1 Assignment
0 Petitions
Accused Products
Abstract
An optimized operating schedule is obtained while avoiding a complexity of formulation and optimization in response to an incentive type demand response. A device includes an energy predictor setting a predicted value of energy of a control-target device within a predetermined future period, a schedule optimizer optimizing the operating schedule of the control-target device within the predetermined period in accordance with a predetermined evaluation barometer, an incentive acceptance determiner determining a time with a possibility that an incentive is receivable, an electricity suppressing schedule optimizer optimizing, for a time with a possibility that the incentive is receivable, the operating schedule of the control-target device based on a unit price of electricity fee having a unit price for calculating the incentive taken into consideration, and an adopted schedule selector selecting either one of the operating schedules.
-
Citations
11 Claims
-
1. An electricity suppressing type electricity and heat optimizing control device comprising:
-
an energy predictor configured to set, for at least one of control-target devices which are an energy supplying device supplying energy, an energy consuming device consuming energy, and an energy storing device storing energy, a predicted value of consumed energy of the energy consuming device or of supplied energy of the energy supplying device within a predetermined future time period; an incentive acceptance determiner configured to determine a time that an incentive is receivable by a reduction of electricity usage based on the predicted value, an electricity suppression target time that is a time prepared for applying an incentive to electricity suppression, and a base line that is a threshold for whether or not to apply the incentive; an electricity suppressing schedule optimizer configured to plan the operating schedule of the control-target device within the predetermined future time period so as to minimize a predetermined evaluation barometer that is a required cost for an energy when the control-target device is activated based on the predicted value, a characteristic of the control-target device, and a unit price of an energy usage fee which is increased so as to reduce a possibility to be selected by adding an incentive unit price to the unit price of an energy usage fee at a time at which incentive is determined receivable; a schedule optimizer configured to plan an operating schedule of the control-target device within the predetermined future time period so as to minimize the predetermined evaluation barometer based on the predicted value, the characteristic of the control-target device, and the unit price of an energy usage fee without the incentive; an adopted schedule selector configured to select either the operating schedule planned by the electricity suppressing schedule optimizer or the operating schedule planned by the schedule optimizer based on the predetermined evaluation barometer or a selection instruction input externally; and a rescheduling necessity determiner configured to determine whether or not it is necessary to optimize the operating schedule again based on the operating schedule, and operation data of the control-target device operated based on the operating schedule. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. An electricity suppressing type electricity and heat storage optimizing method causing a computer or an electric circuit to execute:
-
an energy predicting process for setting, for at least one of control-target devices which are an energy supplying device supplying energy, an energy consuming device consuming energy, and an energy storing device storing energy, a predicted value of consumed energy of the energy consuming device or of supplied energy of the energy supplying device within a predetermined future time period; an incentive acceptance determining process for determining a time that an incentive is receivable by a reduction of electricity usage based on the predicted value, an electricity suppression target time that is a time prepared for applying an incentive to electricity suppression, and a base line that is a threshold for whether or not to apply the incentive; an electricity suppressing schedule optimizing process for planning the operating schedule of the control-target device within the predetermined future time period so as to minimize a predetermined evaluation barometer that is a required cost for an energy when the control-target device is activated based on the predicted value, a characteristic of the control-target device, and a unit price of an energy usage fee which is increased so as to reduce a possibility to be selected by adding an incentive unit price to the unit price of an energy usage fee at a time at which incentive is determined receivable; a schedule optimizing process for planning an operating schedule of the control-target device within the predetermined future time period so as to minimize the predetermined evaluation barometer based on the predicted value, the characteristic of the control-target device, and the unit price of an energy usage fee without the incentive; an adopted schedule selecting process for selecting either the operating schedule planned through the electricity suppressing schedule optimizing process or the operating schedule planned through the schedule optimizing process based on the predetermined evaluation barometer or a selection instruction input externally; and a rescheduling necessity determining process for determining whether or not it is necessary to optimize the operating schedule again based on the operating schedule, and operation data of the control-target device operated based on the operating schedule.
-
-
11. A computer readable non-transitory recording medium having stored therein an optimizing program for an electricity suppressing type electricity and heat storage that causes a computer to execute:
-
an energy predicting process for setting, for at least one of control-target devices which are an energy supplying device supplying energy, an energy consuming device consuming energy, and an energy storing device storing energy, a predicted value of consumed energy of the energy consuming device or of supplied energy of the energy supplying device within a predetermined future time period; an incentive acceptance determining process for determining a time that an incentive is receivable by a reduction of electricity usage based on the predicted value, an electricity suppression target time that is a time prepared for applying an incentive to electricity suppression, and a base line that is a threshold for whether or not to apply the incentive; an electricity suppressing schedule optimizing process for planning the operating schedule of the control-target device within the predetermined future time period so as to minimize a predetermined evaluation barometer that is a required cost for an energy of when the control-target device is activated based on the predicted value, a characteristic of the control-target device, and a unit price of an energy usage fee which is increased so as to reduce a possibility to be selected by adding an incentive unit price to the unit price of an energy usage fee at a time at which incentive is determined receivable; a schedule optimizing process for planning an operating schedule of the control-target device within the predetermined future time period so as to minimize the predetermined evaluation barometer based on the predicted value, the characteristic of the control-target device, and the unit price of an energy usage fee without the incentive; an adopted schedule selecting process for selecting either the operating schedule planned through the electricity suppressing schedule optimizing process or the operating schedule planned through the schedule optimizing process based on the predetermined evaluation barometer or a selection instruction input externally; and a rescheduling necessity determining process for determining whether or not it is necessary to optimize the operating schedule again based on the operating schedule, and operation data of the control-target device operated based on the operating schedule.
-
Specification