×

Resource integrity during partial backout of application updates

  • US 9,921,905 B2
  • Filed: 03/25/2016
  • Issued: 03/20/2018
  • Est. Priority Date: 02/10/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method, comprising:

  • by a processor in response to failure of an application that initiated updates to a plurality of operational system resources without the updates being successfully committed;

    for each physically inconsistent operational system resource that was left in a non-fully functional data indexing and access state as a result of the failure of the application;

    performing a portion of available pending updates to change the respective physically inconsistent operational system resource to a partially backed out operational system resource with a fully functional data indexing and access state; and

    ignoring any remaining available pending updates for the respective partially backed out operational system resource after the respective fully functional data indexing and access state is achieved to expedite system restart.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×