×

Detection of dynamic train-to-rail shunting performance

  • US 9,956,972 B2
  • Filed: 03/02/2015
  • Issued: 05/01/2018
  • Est. Priority Date: 03/02/2015
  • Status: Active Grant
First Claim
Patent Images

1. A railroad system comprising:

  • a first sensor plate connected to a top portion of a first rail of a railroad track;

    a second sensor plate connected to a top portion of a second rail of the railroad track, the second sensor plate being located across from the first sensor plate;

    a measurement device adapted to measure a characteristic associated with a train traveling over the first and second sensor plates; and

    a capturing system configured to capture images of a portion of the train as the train is traveling over the first and second sensor plates and simultaneously capture measurements of the characteristic as the train is traveling over the first and second sensor plates,wherein the characteristic comprises a train-to-rail shunt impedance.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×