Electric power system for one or more electric cranes
First Claim
Patent Images
1. An electric power system for a plurality of electric cranes, comprising:
- a single energy storage device having a first peak power rating; and
an energy transfer circuit operable to provide electric grid energy to the energy storage device and further operable to cause the energy storage device to supply an entire electric demand to the plurality of electric cranes that together have a second peak power rating no greater than the first peak power rating.
1 Assignment
0 Petitions
Accused Products
Abstract
According to one aspect, an electric power system includes an energy storage device having a first peak power rating and an energy transfer circuit operable to provide electric grid energy to the energy storage device. The energy transfer circuit is further operable to cause electric energy to be supplied from the energy storage device to at least one electric crane having a second peak power rating no greater than the first peak power rating throughout an entire operational load range.
11 Citations
22 Claims
-
1. An electric power system for a plurality of electric cranes, comprising:
-
a single energy storage device having a first peak power rating; and an energy transfer circuit operable to provide electric grid energy to the energy storage device and further operable to cause the energy storage device to supply an entire electric demand to the plurality of electric cranes that together have a second peak power rating no greater than the first peak power rating. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. An electric power system for an electric crane, comprising:
-
a single energy storage device having a first peak power rating; the electric crane having a second peak power rating less than the first peak power rating and capable of developing regenerative energy; and an energy transfer circuit that provides electric grid energy and the regenerative energy to the energy storage device to charge the energy storage device and further provides operating power from the energy storage device exclusively to meet an entire electrical demand for the electric crane throughout an entire operational range of the electric crane. - View Dependent Claims (12, 13, 14, 15, 16, 17)
-
-
18. An electric power system for a plurality of electric cranes, comprising:
-
a single energy storage device having a first peak power rating; the plurality of electric cranes having a combined second peak power rating less than the first peak power rating and each being capable of developing regenerative energy; and an energy transfer circuit that provides electric grid energy and the regenerative energy to the energy storage device to charge the energy storage device and further providing operating power from the energy storage device to meet an entire electrical demand for the plurality of electric cranes throughout an entire operational range of each electric crane. - View Dependent Claims (19, 20, 21, 22)
-
Specification