×

Self-contained electrical meter arrangement with isolated electrical meter power supply

  • US 9,989,568 B2
  • Filed: 04/07/2014
  • Issued: 06/05/2018
  • Est. Priority Date: 04/07/2014
  • Status: Active Grant
First Claim
Patent Images

1. An electrical meter comprising:

  • a housing;

    an electrical interface including a plurality of electrical connections having a predetermined physical layout;

    a plurality of voltage measurement elements within the housing, each of the plurality of voltage measurement elements connected to at least one of the plurality of electrical connections;

    an electrical metering circuit within the housing and configured to detect power consumption based at least in part on monitoring a voltage at each of the plurality of voltage measurement elements;

    a power supply electrically connected to the electrical metering circuit and being positioned within the housing, the power supply supplying power to one or more circuits of the electrical meter; and

    wherein the power supply is configured to be connected to a signal transformer dedicated to the power supply, the signal transformer being selected and configured for electrical connection to a phase of an electrical service, the signal transformer configured to provide a lower voltage to the power supply than is supplied by the electrical service.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×