Techniques for adjacent channel interference mitigation
First Claim
Patent Images
1. Baseband processing circuitry, comprising:
- a memory; and
logic, at least a portion of which is in circuitry coupled to the memory, the logic to;
identify a subframe set based on information comprised in a received message;
identify one or more uplink (UL) power control parameter values for the subframe set; and
determine, based on the one or more UL power control parameter values for the subframe set, a transmit power for transmission by user equipment (UE) of a UL message in a first time-division duplex (TDD) cell during a subframe in the subframe set, the first TDD cell to utilize a first frequency channel, the subframe to comprise a UL subframe according to a dynamically-selected TDD configuration of the first TDD cell, the subframe to comprise a downlink (DL) subframe according to a TDD configuration of a second TDD cell utilizing a second frequency channel that is adjacent to the first frequency channel.
2 Assignments
0 Petitions
Accused Products
Abstract
Techniques for adjacent channel interference mitigation are described. In one embodiment, for example, a user equipment (UE) may comprise logic, at least a portion of which is in hardware, the logic to associate the UE with a pico evolved node B (eNB) in a time-division duplex (TDD) picocell, identify an incongruent uplink (UL) sub-frame for the picocell, and select an enhanced UL transmit power for the incongruent UL sub-frame. Other embodiments are described and claimed.
-
Citations
22 Claims
-
1. Baseband processing circuitry, comprising:
-
a memory; and logic, at least a portion of which is in circuitry coupled to the memory, the logic to; identify a subframe set based on information comprised in a received message; identify one or more uplink (UL) power control parameter values for the subframe set; and determine, based on the one or more UL power control parameter values for the subframe set, a transmit power for transmission by user equipment (UE) of a UL message in a first time-division duplex (TDD) cell during a subframe in the subframe set, the first TDD cell to utilize a first frequency channel, the subframe to comprise a UL subframe according to a dynamically-selected TDD configuration of the first TDD cell, the subframe to comprise a downlink (DL) subframe according to a TDD configuration of a second TDD cell utilizing a second frequency channel that is adjacent to the first frequency channel. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. At least one non-transitory computer-readable storage medium comprising a set of instructions that, in response to being executed at user equipment (UE), cause the UE to:
-
identify a subframe set based on information comprised in a received control message; identify one or more uplink (UL) power control values for the subframe set; and determine, based on the one or more UL power control values for the subframe set, a transmit power for transmission by the UE of a UL message in a first time-division duplex (TDD) cell during a subframe in the subframe set, the first TDD cell to utilize a first frequency channel, the subframe to comprise a UL subframe according to a dynamically-selected TDD configuration of the first TDD cell, the subframe to comprise a downlink (DL) subframe according to a TDD configuration of a second TDD cell utilizing a second frequency channel that is adjacent to the first frequency channel. - View Dependent Claims (10, 11, 12, 13, 14, 15)
-
-
16. User equipment (UE), comprising:
-
a radio frequency (RF) transceiver to receive a control message from an evolved node B (eNB) of a first time-division duplex (TDD) cell; and logic, at least a portion of which is in circuitry coupled to the RF transceiver, the logic to; identify one or more subframes based on the control message; identify one or more uplink (UL) power control parameters for the one or more subframes; and determine, based on the one or more UL power control parameters for the one or more subframes, a transmit power for UL transmission of the UE in the first TDD cell during the one or more subframes, the first TDD cell to utilize a first frequency channel, the one or more subframes to comprise UL subframes according to a dynamically-selected TDD configuration of the first TDD cell, the one or more subframes to comprise downlink (DL) subframes according to a TDD configuration of a second TDD cell utilizing a second frequency channel that is adjacent to the first frequency channel. - View Dependent Claims (17, 18, 19, 20, 21, 22)
-
Specification