×

Method of offshore platform construction using a tension-moored barge

  • US H1,815 H
  • Filed: 03/24/1997
  • Issued: 11/02/1999
  • Est. Priority Date: 03/24/1997
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of installing an integrated deck onto an offshore platform substructure having a slot in an upper end thereof for receiving a barge carrying said integrated deck, comprising the steps of:

  • (a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;

    (b) installing a plurality of tethers between said barge and a plurality of foundation elements;

    (c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;

    (d) lowering said integrated deck to contact said offshore platform substructure; and

    (e) ballasting said barge to assist in transferring the weight of said deck onto said offshore platform substructure.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×