×

System for dynamically managing resource connectivity

  • US 10,164,855 B2
  • Filed: 02/15/2017
  • Issued: 12/25/2018
  • Est. Priority Date: 02/15/2017
  • Status: Active Grant
First Claim
Patent Images

1. A computerized system for dynamically managing resource connectivity, comprising:

  • a communication device in communication with a plurality of user devices of a plurality of users over a network, the plurality of user devices comprising a first user device of a first user and a second user device of a second user;

    a processor;

    a memory; and

    a resource management module stored in the memory, executable by the processor and configured for;

    identifying a plurality of resource deficiencies associated with a first plurality of users of the plurality of users, wherein each resource deficiency of the plurality of resource deficiencies is associated with a resource deficiency parameter;

    constructing a resource deficiency object repository comprising a plurality of resource deficiency objects associated with the plurality of resource deficiencies, wherein constructing the resource deficiency object repository comprises;

    constructing for each of the plurality of resource deficiencies, a resource deficiency object based on at least the resource deficiency parameter, wherein the resource deficiency object is configured for selection within the resource deficiency object repository based on the resource deficiency parameter;

    determining a resource provisioning capability associated with the second user, wherein the resource provisioning capability of the second user is associated with a resource provisioning parameter;

    constructing a resource provisioning object associated with the resource provisioning capability of the second user based on at least the resource provisioning parameter;

    parsing the resource deficiency object repository to identify a first resource deficiency object of the plurality of resource deficiency objects having a first resource deficiency parameter that corresponds to the resource provisioning parameter, wherein the first resource deficiency object is associated with a first resource deficiency of the first user, the first plurality of users comprising the first user;

    determining that the resource provisioning capability associated with the second user matches the first resource deficiency associated with the first user, based on identifying that the first resource deficiency parameter corresponds to the resource provisioning parameter;

    based on determining that the resource provisioning capability associated with the second user matches a first resource deficiency of the first user, establishing, automatically, a resource connection between the first resource deficiency object and the resource provisioning object, comprising appending the first resource deficiency object with the resource provisioning object, wherein establishing the resource connection further comprises notifying the first user, via the first user device of the first user, regarding the resource connection;

    receiving an indication from the first user, via the first user device, accepting the resource connection; and

    initiating transfer of resources corresponding to the resource provisioning capability associated with the second user to the first user.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×