High level central plant optimization

DC
  • US 10,175,681 B2
  • Filed: 02/27/2015
  • Issued: 01/08/2019
  • Est. Priority Date: 05/01/2014
  • Status: Active Grant
First Claim
Patent Images

1. An optimization and control system for a central plant configured to serve building energy loads, the optimization and control system comprising:

  • a central plant controller configured to receive utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve building energy loads at each of the plurality of time steps, the central plant controller comprising;

    a load/rate prediction module configured to use feedback from a building automation system to predict the building energy loads for a plurality of time steps in an optimization period, the feedback from the building automation system comprising input from one or more sensors configured to monitor conditions within a controlled building; and

    a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by the central plant equipment at each of the plurality of time steps;

    wherein the high level optimization module is configured to optimize the objective function over the optimization period subject to load equality constraints and capacity constraints on the central plant equipment to determine an optimal distribution of the predicted building energy loads over multiple groups of the central plant equipment at each of the plurality of time steps, wherein the load equality constraints ensure that the optimal distribution satisfies the predicted building energy loads at each of the plurality of time steps;

    wherein the central plant controller is configured to control the central plant equipment such that the central plant equipment operate to achieve the optimal distribution of the building energy loads at each of the plurality of time steps.

View all claims