×

Graphical process variable trend monitoring with zoom features for use in a process control system

  • US 10,180,681 B2
  • Filed: 03/12/2014
  • Issued: 01/15/2019
  • Est. Priority Date: 03/15/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method in a computing device for providing a process variable pane for monitoring process variables within a graphical depiction of a process control plant, the method comprising:

  • displaying a graphical depiction of a process control plant that includes one or more graphic trend symbols, each graphic trend symbol (i) associated with a process variable within the graphical depiction of the process control plant and (ii) graphically representing process control information related to the associated process variable;

    displaying one or more process variable panes associated with the displayed graphical depiction of the process control plant, wherein one or more process variable panes includes at least a navigation pane, a summary pane, and an expanded pane, each process variable pane including one or more process variable selector icons that correspond to the one or more process variables displayed within the graphical depiction of the process control plant, each process variable selector icon including a graphic trend symbol that corresponds to one of the graphic trend symbols displayed within the graphical depiction of the process plant and displaying one or more process variable attributes associated with each process variable selector icon, wherein the process control attributes include at least one of a parameter name, a type of engineering unit, an alarm trip point, a digital output process variable value, a trend graph, or an alarm tag;

    receiving a selection of one of the process variable selector icons within the summary pane for a particular process variable; and

    highlighting, in response to receiving the selection of the one of the process variable selector icons within the summary pane for the particular process variable (i) the corresponding graphic trend symbol in at least a first one of the process variable panes, wherein the first one of the process variable panes is an expanded view of the corresponding graphic trend symbol and (ii) the corresponding graphic trend symbol in the graphical depiction of the process control plant for the same process variable.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×