×

Trip planning with energy constraint

  • US 10,295,355 B2
  • Filed: 03/19/2015
  • Issued: 05/21/2019
  • Est. Priority Date: 04/04/2014
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • receiving information corresponding at least to (i) a state of charge of an energy storage of a vehicle, (ii) route information corresponding to a planned driving route for the vehicle, and (iii) a predicted driver characteristic;

    determining, using the received information, a first energy-versus-distance measure for the planned driving route;

    presenting the first energy-versus-distance measure on a user interface associated with the vehicle;

    receiving, via the user interface, a user input to a drive simulator proposing a what-if scenario, the user input indicating a proposed change in at least the predicted driver characteristic, wherein the proposed change in the predicted driver characteristic would alter the first energy- versus-distance measure;

    determining, using the received information and the user input, a second energy-versus-distance measure for the planned driving route that takes into account the proposed change in the predicted driver characteristic; and

    presenting the second energy-versus-distance measure on the user interface.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×