×

Managing queue distribution between critical datacenter and flexible datacenter

  • US 10,367,353 B1
  • Filed: 10/30/2018
  • Issued: 07/30/2019
  • Est. Priority Date: 10/30/2018
  • Status: Active Grant
First Claim
Patent Images

1. A system comprisinga flexible datacenter comprising:

  • a behind-the-meter power input system,a first power distribution system,a datacenter control system, anda first plurality of computing systems powered by the behind-the-meter power input system via the first power distribution system, wherein the flexible datacenter control system is configured to modulate power delivery to the plurality of computing systems based on one or more monitored power system conditions or an operational directive;

    a critical datacenter comprising;

    a power input system,a second power distribution system,a critical datacenter control system, anda second plurality of computing systems powered by the power input system via the second power distribution system;

    a queue system configured to organize a plurality of computational operations, wherein the queue system is distributed into multiple queue subsystems with each queue subsystem organizing a set of computational operations according to rules associated with that queue subsystem;

    a first communication link connecting the flexible datacenter, the critical datacenter, and the queue system; and

    a routing control system configured to (i) identify, using the queue system, a computational operation to be performed, (ii) determine whether to route the computational operation to the flexible datacenter, and (iii) based on a determination to route the computational operation to the flexible datacenter, cause the computational operation to be sent to the flexible datacenter via the first communication link.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×