1. A system comprising:

  • a first flexible datacenter comprising;

    a first behind-the-meter power input system configured to receive power from a power generation system prior to the power undergoing step-up transformation for transmission to the grid,a first power distribution system,a first datacenter control system, anda first plurality of computing systems powered by the first behind-the-meter power input system via the first power distribution system, wherein the first datacenter control system is configured to modulate power delivery to the first plurality of computing systems based on one or more monitored power system conditions or an operational directive;

    a second flexible datacenter comprising;

    a second behind-the-meter power input system,a second power distribution system,a second datacenter control system, anda second plurality of computing systems powered by the second behind-the-meter power input system via the second power distribution system, wherein the second datacenter control system is configured to modulate power delivery to the second plurality of computing systems based on one or more monitored power system conditions or an operational directive; and

    a routing control system configured to (i) identify a computational operation to be performed, (ii) determine whether to route at least a portion of the computational operation to the first flexible datacenter, and (iii) based on a determination to route at least the portion of the computational operation to the first flexible datacenter, cause a first portion of the computational operation to be sent to the first flexible datacenter and a second portion of the computational operation to be sent to the second flexible datacenter.