×

Load shedding in a guided surface wave power delivery system

  • US 10,536,037 B2
  • Filed: 07/02/2018
  • Issued: 01/14/2020
  • Est. Priority Date: 09/09/2015
  • Status: Active Grant
First Claim
Patent Images

1. An apparatus comprising:

  • a guided surface waveguide probe configured to transmit a guided surface wave along a lossy conducting medium; and

    a load shedding controller device configured to send load shedding instructions to a plurality of user devices, wherein the load shedding instructions regulate user device consumption of electrical energy provided by the guided surface wave amongst the plurality of user devices by spreading out activation and deactivation of load shedding conservations amongst the plurality of user devices.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×