Methods and apparatus for wellbore construction and completion
First Claim
Patent Images
1. A method for lining a wellbore, comprising:
- providing a drilling assembly comprising an earth removal member and a wellbore lining conduit, wherein the drilling assembly includes a first fluid flow path and a second fluid flow path;
advancing the drilling assembly into the earth;
flowing a fluid through the first fluid flow path and returning at least a portion of the fluid through the second fluid flow path; and
leaving the wellbore lining conduit at a location within the wellbore.
2 Assignments
0 Petitions
Accused Products
Abstract
The present invention relates methods and apparatus for lining a wellbore. In one aspect, a drilling assembly having an earth removal member and a wellbore lining conduit is manipulated to advance into the earth. The drilling assembly includes a first fluid flow path and a second fluid flow path. Fluid is flowed through the first fluid flow path, and at least a portion of which may return through the second fluid flow path. In one embodiment, the drilling assembly is provided with a third fluid flow path. After drilling has been completed, wellbore lining conduit may be cemented in the wellbore.
199 Citations
36 Claims
-
1. A method for lining a wellbore, comprising:
-
providing a drilling assembly comprising an earth removal member and a wellbore lining conduit, wherein the drilling assembly includes a first fluid flow path and a second fluid flow path;
advancing the drilling assembly into the earth;
flowing a fluid through the first fluid flow path and returning at least a portion of the fluid through the second fluid flow path; and
leaving the wellbore lining conduit at a location within the wellbore. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21)
-
-
22. An apparatus for lining a wellbore, comprising:
a drilling assembly comprising an earth removal member, a wellbore lining conduit, and a first end, the drilling assembly including a first fluid flow path and a second fluid flow path therethrough, wherein fluid is movable from the first end through the first fluid flow path and returnable through the second fluid flow path when the drilling assembly is disposed in the wellbore. - View Dependent Claims (23, 24)
-
25. A method for placing tubulars in an earth formation comprising:
-
advancing concurrently a portion of a first tubular and a portion of a second tubular to a first location in the earth;
further advancing the second tubular to a second location in the earth;
inserting a drilling assembly in the second tubular; and
advancing the drilling assembly through a lower end of the second tubular. - View Dependent Claims (26, 27, 28)
-
-
29. A method of cementing a borehole, comprising:
-
extending a drill string into the earth to form the borehole, the drill string including an earth removal member having at least one fluid passage therethrough, the earth removal member operatively connected to a lower end of the drill string;
drilling the borehole to a desired location using a drilling mud passing through the at least one fluid passage;
providing at least one secondary fluid passage between the interior of the drill string and the borehole; and
directing a physically alterable bonding material into an annulus between the drill string and the borehole through the at least one secondary fluid passage. - View Dependent Claims (30, 31, 32)
-
-
33. A method of drilling a wellbore with casing, comprising:
-
placing a string of casing operatively coupled to a drill bit at the lower end thereof into a previously formed wellbore;
urging the string of casing axially downward to form a new section of wellbore;
pumping fluid through the string of casing into an annulus formed between the string of casing and the new section of wellbore; and
diverting a portion of the fluid into an upper annulus in the previously formed wellbore. - View Dependent Claims (34, 35, 36)
-
Specification