×

Electric utility storm outage management

  • US 20050096856A1
  • Filed: 11/03/2003
  • Published: 05/05/2005
  • Est. Priority Date: 11/03/2003
  • Status: Active Grant
First Claim
Patent Images

1. A method for electric utility storm outage management, the method comprising:

  • determining an interconnection model of an electric utility power circuit, the power circuit comprising power circuit components;

    determining information indicative of weather susceptibility of the power circuit components;

    determining a weather prediction; and

    determining a predicted maintenance parameter based on the interconnection model, the weather susceptibility information, and the weather prediction.

View all claims
  • 7 Assignments
Timeline View
Assignment View
    ×
    ×