Method and system for testing a partially formed hydrocarbon well for evaluation and well planning refinement
First Claim
1. A method for testing a partially formed well, comprising:
- forming a first well bore intersecting a subterranean formation, the first well bore comprising a portion of a well and having a first configuration;
testing a production characteristic of the subterranean formation through the first well bore in the first configuration;
reconfiguring the first well bore to a second configuration disparate from the first configuration;
testing the production characteristic of the subterranean formation through the first well bore in the second configuration; and
planning further formation of the well based on testing of the subterranean formation through the first well bore in the first and second configurations.
5 Assignments
0 Petitions
Accused Products
Abstract
A method and system for testing a partially formed well includes forming a first well bore intersecting a subterranean formation. The first well bore includes a portion of a planned well having a first configuration. A production characteristic of the subterranean formation is tested through the first well bore in the first configuration. The first well bore is reconfigured to a second configuration different from the first configuration. The production characteristic of the subterranean formation is re-tested through the first well bore in the second configuration. Further formation of the planned well is planned based on testing of the subterranean formation through the first well bore in the first and second configurations.
112 Citations
16 Claims
-
1. A method for testing a partially formed well, comprising:
-
forming a first well bore intersecting a subterranean formation, the first well bore comprising a portion of a well and having a first configuration;
testing a production characteristic of the subterranean formation through the first well bore in the first configuration;
reconfiguring the first well bore to a second configuration disparate from the first configuration;
testing the production characteristic of the subterranean formation through the first well bore in the second configuration; and
planning further formation of the well based on testing of the subterranean formation through the first well bore in the first and second configurations. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14)
-
-
15. A system for testing a partially formed well, comprising:
-
means for forming a first well bore intersecting a subterranean formation, the first well bore comprising a portion of a well and having a first configuration;
means for testing a production characteristic of the subterranean formation through the first well bore in the first configuration;
means for reconfiguring the first well bore to a second configuration disparate from the first configuration;
means for testing the production characteristic of the subterranean formation through the first well bore in the second configuration; and
means for planning further formation of the well based on testing of the subterranean formation through the first well bore in the first and second configurations.
-
-
16. A method for forming a well, comprising drilling a first well bore intersecting a subterranean formation;
-
forming a cavity in the first well bore at the subterranean formation;
testing a characteristic of the subterranean formation through the well bore;
enlarging the cavity in the subterranean formation;
re-testing the characteristic of the subterranean formation through the well bore having the enlarged cavity; and
further drilling bore hole associated with the well bore based on testing and re-testing results.
-
Specification