Apparatus and method for capacity planning for data center server consolidation and workload reassignment

  • US 20080077366A1
  • Filed: 09/22/2006
  • Published: 03/27/2008
  • Est. Priority Date: 09/22/2006
  • Status: Active Grant
First Claim
Patent Images

1. A server migration tool for predictive analysis of a computer network comprising:

  • (a) a source data center configuration;

    (b) a source parameter set;

    (c) a graphical user interface adapted to generate a desired data center configuration;

    (d) a transform engine, in communication with the graphical user interface, for modifying the source parameter set into a destination parameter set by reference to the desired data center configuration; and

    ,(e) the destination parameter set providing a basis for submission to a modeling tool for predictive analysis.