×

SYSTEM AND METHOD FOR REAL-TIME MANAGEMENT OF FORMATION FLUID SAMPLING WITH A GUARDED PROBE

  • US 20080125973A1
  • Filed: 09/22/2006
  • Published: 05/29/2008
  • Est. Priority Date: 09/22/2006
  • Status: Active Grant
First Claim
Patent Images

1. A method for real-time management of sampling of formation fluids from an earth formation surrounding a wellbore, the region of the formation immediately surrounding the wellbore being at least partially invaded by wellbore fluids, comprising:

  • withdrawing fluids from the earth formation;

    sensing a physical or chemical property of the withdrawn fluids;

    outputting a signal corresponding to the sensed physical or chemical property;

    using the output signal to model properties of the withdrawn fluids; and

    using the modeled properties of the fluid sample for the real-time management of the sampling of the formation fluids.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×