×

Performance-based logistics for aerospace and defense programs

  • US 20080126171A1
  • Filed: 06/05/2007
  • Published: 05/29/2008
  • Est. Priority Date: 10/17/2000
  • Status: Active Grant
First Claim
Patent Images

1. A performance-based logistics contracting system comprising:

  • an input system for defining contractual requirements comprising product data;

    a maintenance system comprising;

    a communication interface operable to receive;

    component data from a supplier data source, said component data corresponding to said product data;

    operational data from an equipment sensor; and

    worker qualifications data from a human resources system;

    memory storing the component data, operational data, and the worker qualifications data;

    a configuration monitor operable to determine a configuration maintenance requirement when an equipment configuration is out-of-date;

    a predictive maintenance controller coupled to the memory and comprising;

    a timer;

    a scheduler receiving time data, duration data, or both from the timer; and

    a maintenance module coupled to the scheduler and comprising a financial analyzer and a longevity estimator, a probability of failure predictor, or both;

    where the predictive maintenance controller is operable to determine a predictive maintenance plan based on the component data, worker qualifications data, the operational data, and a predictive maintenance factor;

    a resource planner operable to plan for availability of a component for performing maintenance consistent with the configuration maintenance requirement and operable to coordinate the configuration maintenance requirement and the predictive maintenance plan into a combined maintenance schedule for both the configuration maintenance requirement and the predictive maintenance plan; and

    where the communication interface is further operable to transmit the combined maintenance schedule;

    to a project personnel management system; and

    to a purchasing and inventory control system.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×