1. A system for scheduling two or more print job suites for shipment to:
- two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising;
(A) a print job processing estimator for estimating a time required to process the one or more print job documents of the first print job suite; and
(B) a production manager communicating with said print job processing estimator, said production manager using said time estimated by said print job processing estimator for causing processing of the one or more print job documents of the first print job suite to occur prior to processing of the one or more print job documents of the second print job suite, wherein the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations before the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations.
1 Assignment
0 Petitions
Accused Products
Abstract
There is provided a system for scheduling two or more print job suites for shipment to two or more different physical destinations. The system includes a print job processing estimator for estimating a time required to process a first one of the two or more print job suites. The system further includes a print job production manager which uses the time estimated by the print job processing estimator to cause the first one of the two or more print job suites to be processed for shipment before a second one of the print job suites is processed for shipment.
22 Citations
26 Claims
-
1. A system for scheduling two or more print job suites for shipment to:
- two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising;
(A) a print job processing estimator for estimating a time required to process the one or more print job documents of the first print job suite; and (B) a production manager communicating with said print job processing estimator, said production manager using said time estimated by said print job processing estimator for causing processing of the one or more print job documents of the first print job suite to occur prior to processing of the one or more print job documents of the second print job suite, wherein the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations before the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
- two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising;
-
9. A system for scheduling two or more print job suites for shipment to two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising:
-
(A) a print job estimator for estimating (1) a time required to process the one or more print job documents of the first print job suite; and
(2) a time required to process the one or more print job documents of the second print job suite;(B) a production manager; (C) wherein, when a first selected condition is met, said production manager uses said time estimated in said (A)(1) for causing processing of the one or more print job documents of the first print job suite prior to processing of the one or more print job documents of the second print job suite, wherein the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations before the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations; and (D) wherein, when a second selected condition is met, said production manager uses said time estimated in said (A)(2) for causing processing of the one or more print job documents of the second print job suite to occur prior to processing of the one or more print job documents of the first print job suite, wherein the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations before the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations. - View Dependent Claims (10, 11, 12, 13)
-
-
14. A method of scheduling two or more print job suites for shipment to two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising:
-
(A) estimating a time required to process the one or more print job documents of the first print job suite; and (B) scheduling processing of the first and second print job suites, with said time estimated in said (A), for causing processing of the one or more print job documents of the first print job suite to occur prior to processing of the one or more print job documents of the second print job suite, wherein the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations before the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations. - View Dependent Claims (15, 16, 17, 18, 19, 20, 21)
-
-
22. A method of scheduling two or more print job suites for shipment to two or more different physical destinations, the two or more print job suites including a first print job suite with one or more print job documents and a second print job suite with one or more print job documents, the first print job suite being intended for shipment to a first one of the two or more different physical destinations, and the second print job suite being intended for shipment to a second one of the two or more different physical destinations, comprising:
-
(A) estimating a time required to process the one or more print job documents of the first print job suite; (B) estimating a time required to process the one or more print job documents of the second print job suite; (C) when a first selected condition is met, scheduling processing of the first and second print job suites, with said time estimated in said (A), for causing processing of the one or more print job documents of the first print job suite to occur prior to processing of the one or more print job documents of the second print job suite, wherein the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations before the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations; and (D) when a second selected condition is met, scheduling processing of the first and second print job suites, with said time estimated in said (B), for causing processing of the one or more print job documents of the second print job suite to occur prior to processing of the one or more print job documents of the first print job suite, wherein the processed second print job suite is ready for shipment to the second one of the two or more different physical destinations before the processed first print job suite is ready for shipment to the first one of the two or more different physical destinations. - View Dependent Claims (23, 24, 25, 26)
-